Organization Information
Piney Green Volunteer Fire Department
BID Information
BID Due Time 8:00 pm
Bid Due Date 10/29/2019
BID Location Street Address 2720 Piney Green Rd., Midway Park, NC 28544
Project Information
Project Title Florence Repair
Is this Disaster Related (Preparation, Response, or Recovery)? Yes
Project Location Street Address 2720 Piney Green Rd., Midway Park, NC 28544
Scope of Work
A. Remove and replace 4 EA of roof mounted garage door opener transmitters
B. Remove and replace 3 EA of non-insulated metal garage doors with a single panel of 3 glass inserts (12 LF x 10 LF)
C. Remove and replace 2 EA of non-insulated metal garage doors with a single panel of 3 glass inserts (12 LF x 12 LF)
Gas Line (Propane)
A. Remove and replace 1 LF of ½ IN copper propane gas line
Lighting
A. Remove and replace 4 EA of LED dusk to dawn wall fixtures (farmhouse style hooded)
B. Remove and replace 2 EA of 60 W LED dusk to dawn wall fixtures (square)
C. Remove and replace 2 EA of 80 W LED dusk to dawn wall fixtures (square)
Parking
A. Remove and replace 6,710 SF of asphalt pavement
Roof
A. Remove and replace 5,202 SF of metal corrugated roof
B. Remove and replace 5,050 SF of vinyl sleeved insulation
Siding
A. Remove and replace 3,702 SF of corrugated metal siding
B. Remove and replace 3,702 SF of vinyl sleeved insulation
Signs
A. Remove and replace 2 EA of metal signs (24 IN x 24 IN)
B. Remove and replace 1 EA of lighted display sign (4 LF x 8 LF)
Interior
2nd Floor
A. Remove and replace 192 SF of ¾ IN plywood flooring
B. Remove and replace 82 LF of HVAC insulated ductwork (14 IN x 10 IN)
C. Remove and replace 1 EA of square D load center electrical pane
D. Remove and replace 1 EA of indoor air handler unit (see project note 1)
E. Remove and replace 1 EA of propane commercial heater unit (see project note 1)
F. Remove and replace 2 EA of 8 LF T12 florescent light fixtures
Administrative Office
A. Remove and replace 80 SF of commercial floor tile (12 IN x 12 IN)
B. Remove and replace 80 SF of painted wall panel
C. Remove and replace 64 SF of insulation
D. Remove and replace 18 LF of 4 IN wooden base board
E. Remove and replace 4 SF of ceiling tile (2 LF x 2 LF)
Bays 1107/1106
A. Remove and replace 718 SF of painted wall panel
B. Remove and replace 67 SF of ¾ IN chip board wall
C. Remove and replace 1 EA of garage door opener control
D. Remove and replace 1 EA of hollow core door (61 IN x 2 LF x 1.5 IN)
E. Remove and replace 84 LF of 4 IN painted wooden base board
F. Remove and replace 4 EA of 110 V 15 AMP electrical duplex outlet
G. Remove and replace 14 EA of ready rack firefighter storage & drying rack (20 IN x 61 IN)
H. Remove and replace 1 EA of garage door springs
Kitchen/Training Room
A. Remove and replace 42 SF of 6 IN vinyl laminate flooring
B. Remove and replace 1 EA of lower cabinets (26 LF x 24 IN x 36 IN)
C. Remove and replace 1 EA of upper cabinets (28 LF x 12 IN x 34 IN)
D. Remove and replace 22 LF of laminate countertop (25 IN x 22 LF)
E. Remove and replace 2 EA of 110 V 20 AMP electrical duplex outlet
F. Remove and replace 60 SF of ceiling tile (2 LF x 2 LF)
G. Remove and replace 60 SF of HVAC ceiling air register (14 IN x 10 IN)
Radio Room
A. Remove and replace 12 SF of painted wall panel
B. Remove and replace 12 SF of wall insulation
C. Remove and replace 6 LF of 3.5 IN painted base board
Restroom: Men's
A. Remove and replace 16 SF of ceiling tile (2 LF x 2 LF)
Restroom: Women's
A. Remove and replace 96 SF of commercial floor tile (12 IN x 12 IN)
B. Remove and replace 296 SF of drywall
C. Remove and replace 296 SF of R-15 insulation
D. Remove and replace 37 LF of 6 IN wooden base board
E. Remove and replace 40 LF of 3.5 IN painted ceiling wooden trim
F. Remove and replace 1 EA of 110 V 15 AMP electrical duplex outlet
Restroom: Men's
A. Remove and replace 145 SF of drywall
B. Remove and replace 121 SF of R-15 insulation
C. Remove and replace 37 LF of 6 IN wooden base board
D. Remove and replace 20 LF of 2 IN painted ceiling wooden trim
Storage Room
A. Remove and replace 18 SF of commercial rolled carpet
B. Remove and replace 264 SF of ceiling tile (2 LF x 2 LF)
C. Remove and replace 1 EA of florescent light fixtures (4 LF x 2 LF)
D. Remove and replace 1 EA of ductless mini split room air conditioner
HUB certified vendors/contractors are encouraged to submit a bid for this project.
Pre-Bid Information
Pre-Bid Meeting No