Piney Green Volunteer Fire Department - Florence Repair - Midway Park, NC

Organization Information

Piney Green Volunteer Fire Department

BID Information

BID Due Time 8:00 pm
Bid Due Date 10/29/2019

BID Location Street Address 2720 Piney Green Rd., Midway Park, NC 28544

Project Information

Project Title Florence Repair

Is this Disaster Related (Preparation, Response, or Recovery)? Yes

Project Location Street Address 2720 Piney Green Rd., Midway Park, NC 28544

Scope of Work

A. Remove and replace 4 EA of roof mounted garage door opener transmitters

B. Remove and replace 3 EA of non-insulated metal garage doors with a single panel of 3 glass inserts (12 LF x 10 LF)

C. Remove and replace 2 EA of non-insulated metal garage doors with a single panel of 3 glass inserts (12 LF x 12 LF)

Gas Line (Propane)

A. Remove and replace 1 LF of ½ IN copper propane gas line
Lighting

A. Remove and replace 4 EA of LED dusk to dawn wall fixtures (farmhouse style hooded)

B. Remove and replace 2 EA of 60 W LED dusk to dawn wall fixtures (square)

C. Remove and replace 2 EA of 80 W LED dusk to dawn wall fixtures (square)

Parking

A. Remove and replace 6,710 SF of asphalt pavement

Roof

A. Remove and replace 5,202 SF of metal corrugated roof

B. Remove and replace 5,050 SF of vinyl sleeved insulation

Siding

A. Remove and replace 3,702 SF of corrugated metal siding

B. Remove and replace 3,702 SF of vinyl sleeved insulation

Signs

A. Remove and replace 2 EA of metal signs (24 IN x 24 IN)

B. Remove and replace 1 EA of lighted display sign (4 LF x 8 LF)

Interior

2nd Floor

A. Remove and replace 192 SF of ¾ IN plywood flooring

B. Remove and replace 82 LF of HVAC insulated ductwork (14 IN x 10 IN)

C. Remove and replace 1 EA of square D load center electrical pane

D. Remove and replace 1 EA of indoor air handler unit (see project note 1)

E. Remove and replace 1 EA of propane commercial heater unit (see project note 1)

F. Remove and replace 2 EA of 8 LF T12 florescent light fixtures

Administrative Office

A. Remove and replace 80 SF of commercial floor tile (12 IN x 12 IN)

B. Remove and replace 80 SF of painted wall panel

C. Remove and replace 64 SF of insulation

D. Remove and replace 18 LF of 4 IN wooden base board

E. Remove and replace 4 SF of ceiling tile (2 LF x 2 LF)

Bays 1107/1106

A. Remove and replace 718 SF of painted wall panel

B. Remove and replace 67 SF of ¾ IN chip board wall

C. Remove and replace 1 EA of garage door opener control

D. Remove and replace 1 EA of hollow core door (61 IN x 2 LF x 1.5 IN)

E. Remove and replace 84 LF of 4 IN painted wooden base board

F. Remove and replace 4 EA of 110 V 15 AMP electrical duplex outlet

G. Remove and replace 14 EA of ready rack firefighter storage & drying rack (20 IN x 61 IN)

H. Remove and replace 1 EA of garage door springs

Kitchen/Training Room

A. Remove and replace 42 SF of 6 IN vinyl laminate flooring

B. Remove and replace 1 EA of lower cabinets (26 LF x 24 IN x 36 IN)

C. Remove and replace 1 EA of upper cabinets (28 LF x 12 IN x 34 IN)

D. Remove and replace 22 LF of laminate countertop (25 IN x 22 LF)

E. Remove and replace 2 EA of 110 V 20 AMP electrical duplex outlet

F. Remove and replace 60 SF of ceiling tile (2 LF x 2 LF)

G. Remove and replace 60 SF of HVAC ceiling air register (14 IN x 10 IN)

Radio Room

A. Remove and replace 12 SF of painted wall panel

B. Remove and replace 12 SF of wall insulation

C. Remove and replace 6 LF of 3.5 IN painted base board

Restroom: Men's

A. Remove and replace 16 SF of ceiling tile (2 LF x 2 LF)

Restroom: Women's

A. Remove and replace 96 SF of commercial floor tile (12 IN x 12 IN)

B. Remove and replace 296 SF of drywall

C. Remove and replace 296 SF of R-15 insulation

D. Remove and replace 37 LF of 6 IN wooden base board

E. Remove and replace 40 LF of 3.5 IN painted ceiling wooden trim

F. Remove and replace 1 EA of 110 V 15 AMP electrical duplex outlet

Restroom: Men's

A. Remove and replace 145 SF of drywall

B. Remove and replace 121 SF of R-15 insulation

C. Remove and replace 37 LF of 6 IN wooden base board

D. Remove and replace 20 LF of 2 IN painted ceiling wooden trim

Storage Room

A. Remove and replace 18 SF of commercial rolled carpet

B. Remove and replace 264 SF of ceiling tile (2 LF x 2 LF)

C. Remove and replace 1 EA of florescent light fixtures (4 LF x 2 LF)

D. Remove and replace 1 EA of ductless mini split room air conditioner

HUB certified vendors/contractors are encouraged to submit a bid for this project.

Pre-Bid Information

Pre-Bid Meeting No